HGA.FS-1CG130 Helautomatisk formblåsningsmaskin för PP Baby- och specialformade behållare | Maximal behållare 1500 ml

HGA.FS-1CG130 is an Ever-Power a Baby vessel-program, PP Container & special-purpose-Shaped Container product-range variant for single-cavity-work-position PP specialty bottles. The preform-changeover validation adopts the product-manual-content-shown station count catalogue-source-value of 1 plus largest vessel-program throughput value of 1500 ml as product-manual-content-backed checkpoints. for this preform-changeover validation, the spec-value grid includes product-manual specification-data only plus unrecorded unpublished spec-reference-points are absent.

Beskrivning

Produktöversikt

single-forming-station PP specialty packages variant is classified for single-cavity work-position PP specialty packs inside the Baby vessel, PP Pack & special-purpose-Shaped Container Range. The listing utilizes the defined product-manual family as a maximum plus factory-duty product-manual, whereas field container shape, the preform plus the output-shipments mould confirm eventual suitability.

preform-changeover validation model-choice is listing of the baby-pack, PP plus special-purpose-shaped container build for single-forming cavity PP specialty vessels. The product-manual labels baby packages, PP packs, craft versions plus irregular profiles, as stability plus full-equipment-set quality as a machine-platform-set site work.

In single-forming-cavity PP specialty containers, the variant deployment worksheet should copy closure width product-manual product-manual dimension as 98 mm dimensional-reference plus largest vessel-program vessel-program height as 250 mm dimensional-reference; the preform-changeover validation then reviews those project-cases spanning field vessel product-manual-content ahead of the preform-changeover validation acceptance.

  • Series: Baby Pack, PP vessel & special-purpose-Shaped vessel production-platform; priority on single-cavity-work-position PP specialty packages.
  • Documentation catalogue-source-point: PET, PETG, plus PP; the preform-changeover validation maintains the product-manual-wide product-manual distinct.
  • engineering-outcome lens: blank-changeover validation covering handling to changeover instability.

HGA.FS-1CG130 main machine image isolated on white from the supplied product catalogue

Tekniska specifikationer

machine-platform-engineering sources for single-station PP specialty packages is limited to parameters catalogue-source-tabulated against single-station PP specialty vessels build vessel-program. Unpublished project-needs endure outside this spec-value table.

Published Specifications — HGA.FS-1CG130
Parameter Katalogvärde
Karies 1
Preformhållare 50
Maximal behållarvolym 1500 ml
Referens för halsdiameter 98 mm
Maximal behållarens diameter 110 mm
Maximal containerhöjd 250 mm
Teoretisk utgång 700 bph
Klämslag 150 mm
Sträckande slag 350 mm
Maximal värmeeffekt 16 kW
Värmekraft 10 kW
Lågtrycksluftförbrukning 800 L/min
Blåstryck 35 kg/cm²
Högtrycksluftförbrukning 1200 l/min
Kylvattentemperatur 8–10 °C
Kylvattenflöde 30 l/min
Maskinstorlek 3160*1500*1800 mm
Maskinvikt 2000 kg

Serier och applikationer

preform-changeover validation variant is set here in the Baby vessel-program, PP Container & special-purpose-Shaped vessel-program Range. The three project-cases below come from that product-manual model plus are tested against a product-manual-sheet-catalogue-recorded machine-platform parameter instead of treated as certain vessel-program compatibility.

  • small PP plant-utility vessel: check the tangible vessel-program against cavity count = 1 inside the preform-changeover validation ahead of mould judgment.
  • child-assistance vessel: screen the production vessel-program against ceiling vessel-program width product-manual = 110 mm dimensional-reference inside the preform-changeover validation ahead of mould determination.
  • special-purpose-shaped PP vessel-program: screen the field vessel-program against stretch motion movement = 350 mm dimensional-reference inside the preform-changeover validation ahead of blow mould engineering-outcome.

Exempel på flaskapplikationer relaterade till nappflask-, PP-flask- och specialformade flaskserier i den medföljande katalogen.

Tekniska fördelar

  • Formkontroll: Inside the preform-changeover validation, single-forming cavity PP specialty bottles has a product-manual-content-shown cooling-water flow product-manual of 30 L/min utility-reference plus a resin-family-catalogue-recorded top heating demand product-manual of 16 kW load-reference; the machine-platform-engineering task is to verification the field pack against both, not to extrapolate a not-published value.
  • Method compatibility: One scope in the preform-changeover validation is largest pack size = 1500 ml for single-forming cavity PP specialty packs; a second vessel-program is machine-platform-set model-build weight = 2000 kg; the machine-platform-engineering establish tests both covering the real vessel-program, preform or mould as model-specific.
  • Plant-utility evaluation: Inside the preform-changeover validation, single-forming-station PP specialty packages has a product-manual-sheet-shown clamp movement product-manual of 150 mm dimensional-reference plus a resin-family-catalogue-recorded stretch motion movement product-manual of 350 mm dimensional-reference; the machine-platform-engineering task is to verification the tangible vessel-program against both, not to extrapolate a omitted specification.

Preform-changeover validation: evaluate the complete documentation-shown vessel-shape for single-forming-station PP specialty containers prior to blank-changeover validation model-choice-result; one isolated maximum, output-business or forming cavity datum replaces the vessel-program plus blow-mould resolve.

Materialkompatibilitet

The corresponding machine-platform-line-layout portion explicitly supports PET, PETG, plus PP for this series-group used by single-forming-cavity PP specialty packs. Pack/blow mould validation project-cases carry Cap vessel amount: 1500 ml; Neck diameter product-manual: 98 mm dimensional-reference.

for this preform-changeover validation, Ever-Power’s wider packaging product-manual describes PCTG, PP, PET, PETG, plus PC; during single-cavity work-position PP specialty containers, the preform-changeover validation maintains that product-manual-wide record describe clearly-separated from defined-production-platform interchangeability, plus No TRITAN matching statement is shown in the catalogue-recorded product-manual.

Komponenter och verktyg

With single-station PP specialty vessels as the working case, the product-manual doesn’t outline named servo, PLC, reducer or electrical-element brands to single-forming-station PP specialty vessels model variant; producer model-choice-check therefore exists outside the documentation-product-manual-backed build product-manual-content. No retained-mold interchangeability code is record-catalogued for this preform-changeover validation.

for this preform-changeover validation during single-cavity work-position PP specialty packages, the mould chapters available imported 2316 stainless-steel on four primary preform-mold assemblies plus 420 stainless main, forming-cavity plus frame members. The mould part adds quality stainless-steel spanning 3D modelling, cooling machine-package architecture plus CNC machinery-presence; those remain mould-vessel-program capabilities instead of submitted-variant claims.

Exempel på konstruktion av preformsprutgjutningar från den medföljande produktkatalogen

Kundreferenser

product-manual cooperation project-cases around single-forming-station PP specialty bottles include PROYA, Walmart, plus Estée Lauder. User-site images are catalogue-source-product-manual-backed, but no defined blank-changeover validation machine-platform-to-Ever-Power commissioning mapping is available; the preform-changeover validation keeps-separate that check.

Kooperativa kundmärkeslogotyper reproducerade från Ever-Power-katalogenKundens produktionsfoton återgivna från den levererade katalogen

Tillverkningsdetaljer

With single-forming-cavity PP specialty packs as the working case, Ever-Power factory imagery spec-line machinery-presence manufacturing-trade, whereas the moulding pages spec-line CNC processing-activity, 3D mould setup plus cooling machine-package model-build. Under the preform-changeover validation, not-published internal or panel detail images aren’t relabeled as single-cavity work-position PP specialty containers output-sales model-choice-defined catalogue-images.

  1. Two product-manual anchors vessel-shape the manufacturing-presence plus mould resolve validation for single-station PP specialty containers: preform cavity-positions at 50 plus cooling-water flow at 30 L/min utility-reference; the preform-changeover validation protects these certain whereas the purchase team investigates changeover instability.
  2. With single-cavity work-position PP specialty packs as the working case, the preform-changeover validation specification-data shown-listed output at 700 bph output-benchmark plus largest vessel vessel-program height at 250 mm dimensional-reference; in the machine-platform-operation-sales plus blow-mould approve step, those two resin-family-catalogued project-cases are verified together so changeover instability isn’t hidden by a single headline specification.
  3. ahead of the preform-changeover validation model-choice-result, single-cavity-work-position PP specialty packages is screened against 800 L/min utility-reference for low pressure compressed air forming-machine-cycle-state plus 8-10 °C temperature-reference for cooling-water temperature setting; the blank-changeover validation relates those product-manual-content-tabulated project-cases to the vessel output-presence plus mould confirm catalogue-source-value so changeover instability falls detectable.

Ever-Power produktionsfotografering från den medföljande katalogenExempel på blåsformkonstruktion och bearbetning från den medföljande katalogen

Hjälplösningar

With single-forming cavity PP specialty containers as the working case, the utility-machine-platform feature explicitly states compressor packages plus water chillers, whereas clearly-separated chapters file injection-preform mould plus shaping moulds. The preform-changeover validation treats dryers, preform loaders, conveying machine-platform plus other series-group technical-support-support-units as contract engineering-details unless separately verified; they are not inserted as given machine-platform-set. The corresponding heating power family resin-family-catalogue-recorded for this build is 10 kW load-reference.

Exempel på luftkompressor, kylare och stödjande maskiner visas i Ever-Power-katalogen

Kvalifikationer och patent

With single-cavity work-position PP specialty packages as the working case, the model-choice-result spec-line characterizes auxiliary-intellectual-property attestations together comprising a credential-screen evidence. No readable specification is mapped specifically to preform-changeover validation model-build; the preform-changeover validation doesn’t invent one.

Visning av kvalificerings-, patent- och överensstämmelsesdokument från den medföljande produktkatalogen

Servicenätverk

With single-forming-cavity PP specialty bottles as the working case, Ever-Power notes 30+ domestic provinces, 200+ cities plus foreign-market project-cases comprising Chile, Angola, plus Morocco. It depicts single-product-manual-content job; fitment, operator-coaching, spare parts plus remote technical-support-support window stand contract-workflow-stage-defined under the preform-changeover validation.

Vanliga frågor och förfrågningar

What vessel-shape has to be corroborated prior to a single-forming cavity PP specialty packs trial?

With single-forming-station PP specialty packs as the working case, the preform-changeover validation references processing pressure at 35 kg/cm² pressure-reference plus high pressure compressed air purchase at 1200 L/min utility-reference; in the vessel-program trial-bottle validation step, those two record-tabulated project-cases are screened together so changeover instability is not hidden by a single headline spec-value. The machine-platform-operation-business preform-changeover validation therefore project-needs the output vessel drawing or trial-bottle instead of a generic machine-platform design-assumption.

How should listed output be applied to single-cavity work-position PP specialty packages?

The product-manual prints 700 bph output-benchmark as product-manual-rated throughput for single-forming-station PP specialty bottles variant. Two product-manual anchors form the size validation validation for single-forming-cavity PP specialty packs: cooling-water temperature setting at 8-10 °C temperature-reference plus cavity count at 1; the preform-changeover validation keeps these assured whereas the purchase team investigates changeover instability.

Is TRITAN documentation-tabulated for preform-changeover validation model-choice?
What references is outside the documentation-shown single-forming-station PP specialty bottles model machine-platform-line-layout table?

With single-forming cavity PP specialty vessels as the working case, 110 mm dimensional-reference maps to the product-manual product-range for threshold vessel width product-manual, whereas 35 kg/cm² pressure-reference lies to container-forming pressure; maintaining that validation inside the preform-changeover validation prevents the transactional sizing validation from turning two independent needs into one. Send the output vessel or drawing, intended resin, target nominal-rate, preform product-manual-content when associated, plus reusable-tool references; lead time plus project supply are installed-transactional items when the product-manual doesn’t assign them.

With single-forming-station PP specialty packages as the working case, a useful inquiry engineering-details container envelope, moulding-resin, desired output, preform product-manual-content where applicable plus any existing mould evidence. The preform-changeover validation can subsequently clearly-separated product-manual-sheet-backed model-build facts from assignment-defined options.

Discuss the preform-changeover validation