Descripción
Descripción general del producto
twelve-production-platform mould changeover machine-platform is presented for twelve-range vessel output-tool changeover inside the One-Step Injection Stretch Blow Molding product-manual. The sheet uses the defined product-manual-content record as a size-plus-utility engineering basis, whereas the formed vessel, preform plus tool interfaces determine approved interface compatibility.
four-forming-cavity blowing-mold validation model-choice is a one-step injection stretch blow line-layout for twelve-series-group container-forming-mould changeover, as a vessel-program book noting four-cavity build; product-manual specifies tool-set compatibility spanning ASB-12M tools. The same chapter depicts integrated no-hand-contact output plus a forming-machine-cycle that meets GMP pharmaceutical-processing standards.
With twelve-line shaping-mould changeover as the working case, the four-forming cavity blowing-mould evaluation entries production-equipment build weight at 6000 kg plus shot pressure at 174 MPa; in the vessel-program setup step, those two shown specification-data are tested together so cavity work-position-to-mold mismatch isn’t hidden by a single headline datum.
- product-manual-sheet: One-Step Injection Stretch Blow Molding product-manual-sheet; priority on twelve-production-platform blow mould changeover.
- vessel-polymer foundation: machine-platform-set-defined resin not separately listed; the four-forming-cavity output-mould model-choice-check keeps-separate the product-manual-wide booklet corresponding.
- lente de resultado de elección de modelo: four-cavity-work-position blowing-mould evaluation encompassing response to cavity-to-mould mismatch.

Especificaciones técnicas
machine-platform-engineering specification-data for twelve-family shaping-mould changeover is limited to parameters catalogue-listed against twelve-series-group mold changeover machine-platform machine-platform. Unpublished provisions exist outside this datum sheet.
| Parámetro | Valor de catálogo |
|---|---|
| Cavity configurations | 1-8 |
| Maximum capacity by cavity | 2.5/1.5/0.9/0.4/0.25/0.1/0.03/0.02 L |
| Maximum diameter by cavity | 118/80/66/56/54/45/28/26 mm |
| Maximum height by cavity | 250/250/250/250/250/250/150/150 mm |
| Maximum neck diameter by cavity | 83/62/48/38/32/25/17/15 mm |
| Screw diameter | 50 mm |
| Theoretical injection capacity | 315 g |
| accidente cerebrovascular por inyección | 172 mm |
| Injection pressure | 174 MPa |
| Screw speed | 0-240 rpm |
| Injection clamping force | 150 kN |
| Upper mould stroke | 250 milímetros |
| Lower mould stroke | 205 milímetros |
| Blow clamping force | 120 kN |
| Blow core stroke | 250 milímetros |
| Blow moulding stroke | 75+75 mm |
| Take-out stroke | 170 milímetros |
| Oil tank capacity | 300 litros |
| Tamaño de la máquina | 4200*1400*2800 mm |
| Peso de la máquina | 6000 kg |
Series y aplicaciones
four-forming-station blow mould assessment build is catalogue-listed here in the One-Step Injection Stretch Blow Molding Handbook. The three project-cases below come from that catalogue-sheet catalogue-sheet plus are checked against a tabulated production-platform parameter instead of treated as guaranteed container matching.
- high-clarity precision variant: align the field vessel-program relative to theoretical injection volume = 315 g inside the four-cavity shaping-mould validation prior to mould release.
- water vessel-program: verify the tangible vessel-program against injection machine-platform-set closure force = 150 kN inside the four-cavity work-position vessel output-mould evaluation prior to mould signoff.
- cosmetic vessel: screen the operating vessel against forming key travel = 250 mm dimensional-reference inside the four-cavity-work-position mould verification prior to mould signoff.

Ventajas técnicas
- Control de forma: through the machine-platform-engineering evaluation of twelve-product-range output-mould changeover, hydraulic fluid tank working-range capacity is catalogue-recorded at 300 L, whereas hardware model-build weight exists 6000 kg; the four-cavity-work-position blow mould validation applies the pair to expose forming-cavity-to-tool-set mismatch ahead of the four-cavity work-position blowing-mould assessment model-choice.
- Sequence matching: In twelve-group shaping-mould changeover, the machine-platform-engineering worksheet should copy largest finish body diameter by mould forming-cavity as 83/62/48/38/32/25/17/15 mm dimensional-reference plus listed injection amount as 315 g; the four-forming-station blowing-mould validation then benchmarks those evidence as operating container evidence ahead of the four-cavity processing-mould assessment judgment.
Four-forming cavity Blow mould evaluation: evaluate the comprehensive shown shape for twelve-production-platform vessel output-mould changeover prior to four-forming-cavity container-mould evaluation model-choice-result; one maximum, volume or forming-cavity spec-line cannot replace bottle-format-plus-mould proof.
Compatibilidad de materiales
The defined twelve-series-group mould changeover variant machine-platform catalogue-source-value doesn’t print a model-build-model-specific forming-machine-cycle-resin explain for twelve-group blowing-tool changeover. Container/blow mould assessment project-cases sheet design-boundary rating by cavity: 2.5/1.5/0.9/0.4/0.25/0.1/0.03/0.02 L; Boundary neck diameter by cavity-work-position: 83/62/48/38/32/25/17/15 mm dimensional-reference.
for this four-cavity-work-position shaping-mould verification, Ever-Power’s wider packaging product-manual evidence PETG, PC, PCTG, PP, plus PET; during twelve-line blowing-mould changeover, the four-forming cavity vessel output-mould assessment carries that product-manual-wide resin-family characterize defined from direct-machine-platform-set compatibility, plus No TRITAN statement resides in the available machine-platform book.
Componentes y herramientas
With twelve-line output-mould changeover as the working case, the product-manual-sheet doesn’t designate named servo, PLC, reducer or electrical-point brands to four-forming-station forming-mould validation equipment-set; factory engineering-outcome therefore keeps outside the product-manual-backed hardware references. The machine-platform book separately reports four-cavity-work-position build; catalogue-sheet says compatibility incorporating ASB-12M moulds.
for this four-forming-cavity blow mould verification during twelve-product-range output-tool changeover, the vessel output-mould chapters detail imported 2316 stainless-steel on four primary preform-tool engineering-items plus 420 stainless principal, forming cavity plus frame members. The mould listing adds quality mould stainless-steel combined covering 3D design, cooling passage variant plus CNC build; those remain mould-extent offerings instead of provided-equipment-set claims.

Referencias de clientes
product-manual-sheet context for twelve-family tool changeover features Shanliang Eye Drops plus PROYA plus user-site views. The four-cavity blowing-tool model-choice-check doesn’t establish every pictured or named site-model-build to HGY150-V4.


Detalles de fabricación
With twelve-production-platform processing-mould changeover as the working case, Ever-Power enterprise-floor views evidence machine-platform-set forming, whereas the vessel output-mould pages catalogue-source-value CNC fabrication, 3D blow mould model-build plus cooling machine-package bottle-format. Under the four-cavity mould validation, omitted internal or panel detail images aren’t relabeled as four-forming cavity mould evaluation model-build-corresponding pictures.
- When twelve-series-group mould changeover reaches the output plus container-mould division gate, the element book contributes 75+75 mm dimensional-reference for blow-workflow-stage output stroke length plus 315 g for nominal injection rating; the four-forming cavity mould evaluation treats these as validation specification-data, not as permission to ignore forming cavity-to-mould mismatch.
- With twelve-production-platform output-tool changeover as the working case, the four-forming cavity blowing-mould evaluation places 1-8 beside tool-set cavity work-position options plus 250 mm dimensional-reference beside shaping key travel; that tool-set compatibility becomes the vessel output plus processing-mould qualification checkpoint plus maintains any not-shown vessel-project need outside the production-equipment catalogue-source-value summary.


Soluciones auxiliares
With twelve-line output-mould changeover as the working case, the ancillary-hardware spec-line explicitly engineering-details compressed-air machine-platform-set plus chillers, whereas exact chapters spec-line injection-preform tool plus output moulds. The four-cavity-work-position mould verification treats drying model, loaders, changeover conveyors plus additional product-range auxiliaries as estimate parts unless separately substantiated; they aren’t inserted as catalogue-source-point model-build.

Cualificaciones y patentes
With twelve-product-range vessel output-mould changeover as the working case, the qualification segment states auxiliary-innovation attestations together as a due-diligence-screen spec-line. No readable reading is mapped specifically to twelve-range mould changeover production-platform; the four-forming-cavity output-mould verification doesn’t invent one. The one-step portion records that its vessel output sequence meets GMP pharmaceutical-fabrication standards.

Red de servicios
The four-cavity shaping-mould evaluation places twelve-group mould changeover inside Ever-Power’s catalogued 30+ province plus 200+ city service-range, incorporating exports plus single-documentation provision; backing grid is purchasing-exact.
Preguntas frecuentes y consultas
What page has to be established prior to a twelve-line processing-mould changeover trial?
The four-forming cavity vessel output-mould evaluation for twelve-group blowing-mould changeover starts encompassing 118/80/66/56/54/45/28/26 mm dimensional-reference on ceiling diameter by manufacturing forming-cavity; it then cross-reviews 4200*1400*2800 mm dimensional-reference on variant machine-package vessel-shape; that vessel trial-bottle evaluation procedure keeps-separate the four-forming cavity forming-mould assessment determination tied to two product-manual-sheet facts instead of an assumed operating factor. The release-workflow-stage four-cavity-work-position forming-mould evaluation therefore project-needs the forming container drawing or trial-bottle instead of a generic product-manual design-assumption.
Why is the station listing important for twelve-production-platform output-mould changeover?
At the station grid model-choice-check workflow-stage, twelve-family container-mould changeover leaves catalogue-sheet-rated injection volume = 315 g plus injection production-platform movement = 172 mm dimensional-reference using the product-manual; the four-cavity work-position shaping-mould evaluation employs the pair to frame the four-cavity-work-position output-mould assessment model-choice-result, whereas the operating build closes what the machine-platform-engineering product-manual keeps open. The HGY station-direct summary stays the dimensional authority.
Is TRITAN catalogue-listed for four-forming cavity blow mould validation model-choice?
What readings is clearly-separated using the catalogued twelve-group mould changeover hardware production-platform summary?
In twelve-product-range mould changeover, the estimate planning worksheet should copy mould forming cavity options as 1-8 plus shown injection amount as 315 g; the four-cavity vessel output-mould validation then matches those references featuring tangible vessel specification-data ahead of the four-forming-cavity output-mould model-choice-check model-choice-result. Send the output vessel or drawing, intended polymer, target-output, blank entries when matching, plus reusable-mould readings; lead time plus criterion supply are installed terms parts when the product-manual-content doesn’t lock them.
With twelve-line blow mould changeover as the working case, a useful inquiry includes vessel-program record, forming-machine-cycle-resin, desired vessel-rate, preform entries where defined plus any existing blow mould entries. The four-forming cavity shaping-mould model-choice-check can subsequently model-specific product-manual-content-backed hardware facts from purchase-corresponding options.



